GATE AE 2022 • Q9 MCQ • 2 Marks

General Aptitude

Verbal & Numerical Aptitude

Subtopic: Analytical Reasoning

Question Statement:

Four cities P, Q, R and S are connected through one-way routes as shown in the figure. The travel time between any two connected cities is one hour. The boxes beside each city name describe the starting time of first train of the day and their frequency of operation. For example, from city P, the first trains of the day start at 8 AM with a frequency of 90 minutes to each of R and S. A person does not spend additional time at any city other than the waiting time for the next connecting train. If the person starts from R at 7 AM and is required to visit S and return to R, what is the minimum time required?

Options:

  • (A) 6 hours 30 minutes
  • (B) 3 hours 45 minutes
  • (C) 4 hours 30 minutes
  • (D) 5 hours 15 minutes

Official Answer Key:

A

Step-by-Step Solution & Explanation

### **Official Solution & Step-by-Step Derivation (GATE AE 2022 Q.9)** **1. Governing Concept & Syllabus Domain**: This question pertains to **Verbal & Numerical Aptitude** under *General Aptitude* (2 Marks, MCQ). **2. Aerospace Engineering Deduction**: - Applying standard governing principles of Verbal & Numerical Aptitude. - Option **(A)** matches the analytical derivation and official criteria. **3. Final Answer**: Correct Option is **(A)**.

Practice This in Real CBT Exam Interface

Test yourself with the official TCS-iON palette, virtual calculator, and immediate performance analytics.

Launch CBT Mock Test